There is existig stack switch cable is connection.
I.e., from swtich 1 - port 1 towards switch 2 port 2
While adding new stack cable between switch 1 port 2 & swtich 2 port 1 whether any stack swich needs to be reboot or which device is in power on state these new stable can be connected or any configuration changes required