07-02-2013 06:05 PM - edited 03-07-2019 02:12 PM
Hi,
I have a stack of two 3750X switches and want to upgrade to 12.2(58)SE2 version, but this will take long time due to microcode upgrade as well and disrupt the network; is there any way I can upgrade one by one?
Also, currently the switches are running a .tar image; can I go ahead and use a .bin image when upgrading?
Thank you
Solved! Go to Solution.
07-02-2013 06:10 PM
I have a stack of two 3750X switches and want to upgrade to 12.2(58)SE2 version, but this will take long time due to microcode upgrade as well and disrupt the network; is there any way I can upgrade one by one?
It doesn't make any difference. The micro-code will be upgraded and it'll take around 45 minutes to upgrade both units simultaneously.
07-02-2013 06:10 PM
I have a stack of two 3750X switches and want to upgrade to 12.2(58)SE2 version, but this will take long time due to microcode upgrade as well and disrupt the network; is there any way I can upgrade one by one?
It doesn't make any difference. The micro-code will be upgraded and it'll take around 45 minutes to upgrade both units simultaneously.
07-04-2013 02:09 AM