10-13-2011 10:05 AM - edited 03-07-2019 02:47 AM
Hi Team,
I need your support on the below requirement
1) Customer network have two WS-C3750E-24PD-S series switches , SW1 running c3750e-universalk9-mz.122-53.SE2.bin with IP base service . SW2 running with c3750e-ipbasek9-mz.122-53.SE2.bin
Need to have stack between these two switches . with this existing IOS on the two switches stack configuration will support ??
2) On SW2 If I would like to upgrade c3750e-universalk9-mz.122-53.SE2.bin from c3750e-ipbasek9-mz.122-53.SE2.bin (note) without License key . is SW2 comes up with permeant IP base service IOS image ?? and stack configuration possible ??
SW1 sh ver :
system image file is "flash:/c3750e-universalk9-mz.122-53.SE2.bin"
License Level: ipbase
License Type: Permanent
Next reload license Level: ipbase
Model number : WS-C3750E-24PD-S
SW1#sh license
Index 1 Feature: advipservices
Period left: 0 minute 0 second
Index 2 Feature: ipservices
Period left: 8 weeks 4 days
License Type: Evaluation
License State: Active, Not in Use, EULA not accepted
License Priority: None
License Count: Non-Counted
Index 3 Feature: ipbase
Period left: Life time
License Type: Permanent
License State: Active, In Use
License Priority: Medium
License Count: Non-Counted
SW2 sh ver :
System image file is "flash:/c3750e-ipbasek9-mz.122-53.SE2.bin"
License Level: ipbase
License Type: Permanent
Next reload license Level: ipbase
Model number : WS-C3750E-24PD-S
SW2#sh license
Index 1 Feature: advipservices
Period left: 0 minute 0 second
Index 2 Feature: ipservices
Period left: 0 minute 0 second
Index 3 Feature: ipbase
Period left: Life time
License Type: Permanent
License State: Active, In Use
License Priority: Medium
License Count: Non-Counted
Solved! Go to Solution.
10-13-2011 10:18 AM
Hi Santosh,
You already have permanent ipbase license installed on both switch. The licensed is installed once, and it will carry over to the new image (c3750e-universalk9-mz.122-53.SE2.bin) you are trying to install. So before you stack them make sure to upgrade the IOS. Both switches need to have the same exact IOS. Once the upgrade is done you are ready to tack them. follow this link:
HTH
10-13-2011 10:18 AM
Hi Santosh,
You already have permanent ipbase license installed on both switch. The licensed is installed once, and it will carry over to the new image (c3750e-universalk9-mz.122-53.SE2.bin) you are trying to install. So before you stack them make sure to upgrade the IOS. Both switches need to have the same exact IOS. Once the upgrade is done you are ready to tack them. follow this link:
HTH
Find answers to your questions by entering keywords or phrases in the Search bar above. New here? Use these resources to familiarize yourself with the community: