cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
1753
Views
0
Helpful
2
Replies

!!! WARNING: The switch is not usable !!! Cisco WS-C2970G-24TS-E

ajisantoso11
Level 1
Level 1

I have problem with my cisco switch 2970, please somebody advise me. Thanks

Initializing flashfs...

flashfs[1]: 5 files, 1 directories

flashfs[1]: 0 orphaned files, 0 orphaned directories

flashfs[1]: Total bytes: 15998976

flashfs[1]: Bytes used: 5935616

flashfs[1]: Bytes available: 10063360

flashfs[1]: flashfs fsck took 2 seconds.

flashfs[1]: Initialization complete....done Initializing flashfs.

POST: CPU MIC register Tests : Begin

POST: CPU MIC register Tests : End, Status Passed

POST: PortASIC Memory Tests : Begin

POST: PortASIC Memory Tests : End, Status Passed

POST: CPU MIC interface Loopback Tests : Begin

POST: CPU MIC interface Loopback Tests : End, Status Passed

POST: PortASIC RingLoopback Tests : Begin

POST: PortASIC RingLoopback Tests : End, Status Passed

POST: PortASIC CAM Subsystem Tests : Begin

TCAM (asic:6) walking-one test failed

  Write: 80_00000100_00000000-00_00000000_00000000

  Read:  80_00000000_00000000-00_00000000_00000000

POST: POST Failed

POST: PortASIC CAM Subsystem Tests : End, Status Failed

POST: CAM test failed

POST Failed: disabling stack links and shutting down SDP

driver class subsystem initialization failed

This product contains cryptographic features and is subject to United

States and local country laws governing import, export, transfer and

use. Delivery of Cisco cryptographic products does not imply

third-party authority to import, export, distribute or use encryption.

Importers, exporters, distributors and users are responsible for

compliance with U.S. and local country laws. By using this product you

agree to comply with applicable laws and regulations. If you are unable

to comply with U.S. and local laws, return this product immediately.

A summary of U.S. laws governing Cisco cryptographic products may be found at:

http://www.cisco.com/wwl/export/crypto/tool/stqrg.html

If you require further assistance please contact us by sending email to

export@cisco.com.

cisco WS-C2970G-24TS-E (PowerPC405) processor (revision L0) with 122880K/8184K bytes of memory.

Processor board ID CAT0939N5LW

Last reset from power-on

The password-recovery mechanism is enabled.

512K bytes of flash-simulated non-volatile configuration memory.

Base ethernet MAC Address       : 00:15:C6:8E:15:00

Motherboard assembly number     : 73-9095-07

Power supply part number        : 341-0045-01

Motherboard serial number       : CAT094019XU

Power supply serial number      : LIT0910053F

Model revision number           : L0

Motherboard revision number     : A0

Model number                    : WS-C2970G-24TS-E

System serial number            : CAT0939N5LW

Top Assembly Part Number        : 800-24261-05

Top Assembly Revision Number    : B0

Hardware Board Revision Number  : 0x02

!!! WARNING: The switch is not usable !!!

Unable to create l2trace server process, socket_open() failed

Press RETURN to get started!

00:00:46: hl2mcm_core_process: hl2mcm_install_hl2mcm_ctrl_entries() failed.

00:00:46: %SYS-3-HARIKARI: Process HL2MCM top-level routine exited

00:00:47: %SPANTREE-5-EXTENDED_SYSID: Extended SysId enabled for type vlanCannot Get the number of ports in MAC notification

00:00:47: %SW_VLAN-4-IFS_FAILURE: VLAN manager encountered file operation error: call = ifs_read_until (header) / file =  / code = 21 (Is a directory) / bytes transfered = -1

-Traceback= 15CAB8 158B78 C41890 C38E7C

00:00:48: %SYS-5-RESTART: System restarted --

Cisco IOS Software, C2970 Software (C2970-LANBASEK9-M), Version 12.2(35)SE, RELEASE SOFTWARE (fc2)

2 Replies 2

InayathUlla Sharieff
Cisco Employee
Cisco Employee

Hi Aji,

This message typically means a hardware failure.

POST: PortASIC CAM Subsystem Tests : Begin

TCAM (asic:6) walking-one test failed

  Write: 80_00000100_00000000-00_00000000_00000000

  Read:  80_00000000_00000000-00_00000000_00000000

POST: POST Failed

POST: PortASIC CAM Subsystem Tests : End, Status Failed

POST: CAM test failed

POST Failed: disabling stack links and shutting down SDP

If this switch is under contract, it should be RMA'd. No further troubleshooting to be done. ( you may see tht some suggest to reload and format the flash and upload the new ios, but ths will not resolve most of the time. Hence avoid the delay and order the new switch by creating the RMA.)

HTH

Regards

Inayath

*Plz rate all usefull posts.

Leo Laohoo
Hall of Fame
Hall of Fame

Hope you have a valid Service Contract because the switch is dead.

Review Cisco Networking products for a $25 gift card