cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
583
Views
0
Helpful
2
Replies

WS-C3750G-24TS-1U failover timeout

IGOPAV
Level 1
Level 1

Hi Community,

 

I have 2 WS-C3750G-24TS-1U in the stack. After turning off the Master switch and re-electing master for the second switch I have about 40 seconds downtime before Vlan-interfaces become up.

 

According this documentation I have to have only 3-5 seconds for L3-interfaces.

 

The newly elected stack master begins accepting Layer 2 traffic in less than 1 second and Layer 3 traffic between 3 to 5 seconds.

 

Could you suggest what the problem might be?

 

 Switch Ports Model SW Version SW Image
------ ----- ----- ---------- ----------
* 1 28 WS-C3750G-24TS-1U 12.2(55)SE12 C3750-IPSERVICESK9-M
2 28 WS-C3750G-24TS-1U 12.2(55)SE12 C3750-IPSERVICESK9-M

 

1 Accepted Solution

Accepted Solutions

marce1000
VIP
VIP

 

 - If applicable to your case , then take note of the resolving reply of this thread :

               https://community.cisco.com/t5/switching/switch-stack-takes-30-seconds-to-come-up/td-p/1422164

 M.



-- ' 'Good body every evening' ' this sentence was once spotted on a logo at the entrance of a Weight Watchers Club !

View solution in original post

2 Replies 2

marce1000
VIP
VIP

 

 - If applicable to your case , then take note of the resolving reply of this thread :

               https://community.cisco.com/t5/switching/switch-stack-takes-30-seconds-to-come-up/td-p/1422164

 M.



-- ' 'Good body every evening' ' this sentence was once spotted on a logo at the entrance of a Weight Watchers Club !

Leo Laohoo
Hall of Fame
Hall of Fame

WTF.  Did you pull the power immediately after Switch 1 came online?

Review Cisco Networking products for a $25 gift card