I Have a customer who is running following application/version in a backup DataCenter and would like to move the UCS server in a different physical location.
The goal is up upgrade all the applications to versions 11.x either before or after a physical move.
So my question is around caveats of changing IP/Hostname and should we change IP/Hostname before or after the upgrade ?
CUCM: 9.1.2
UCCX: 9.0.2
IM&P: 9.1.1
Unity Connection: 9.1.2
I Know for CCX Cisco does not support changing the hostname in any version of CCX below 10.0 but introduced support for it with the 10.0(1) release
So I'm looking for overall strategy for an upgrade and the physical move.
Thanks,