Hi All,
I have followed the video upgrading from 8.6 to 10 via PCD, but it showed the migration only.
Our current environment is Virtualized Cucm 8.6.2 on UCS. We wish to upgrade to CUCM 10.5, including Presence, utilising PCD.
1. Is it best to do a migration task, running side by side, and then once I turn the 8.6.2 off, then re-ip 10.5 with same old IP addresses.
OR
2. Perform the upgrade task of the 8.6.2 and then have quite a bit of outage time?
Is the migration task only recommended going from physical to virtualized, or fine for virtualized to virtualized?
Thanks in advance