IN UCS how can I reboot the chassis only or shut is down ???
Solved! Go to Solution.
12-15-2010 12:41 AM
Here is how you can Deomm:
1) Make sure you remove thr profiles from the blade.
2) Select ths chassis# in the equipment tab -> Under the genreal tab -> Choose the option for Decommission Chassis
3) Wait for about 10-15 minutes for it to complete
4) To discover it again:
i) First make sure the cables are conencted properly, i.e. only from IOM A to FI-A and the number of cables are same or more then the links specified in the chassis discovery policy,
ii) Select the Chassis OU under the equipment -> Select the "Decommissined" tab from the work pannel. You'll find the chassis which you removed, you can add it back from there.
I am not sure, what you exactly meant by this : "shall the GP of FBI A be 2 not one"??
,/Abhinav
12-14-2010 03:21 AM
Hi Mohammad,
The only option to do so if by pulling the power cables out.
Before shutting or power re-cycling the chassis, remember to shut down the OS running on all the blades.
Also if you have any major activities on the system, taking a full back and a configuration backup will be a good idea.
Thanks!
./Abhinav
12-14-2010 08:44 AM
I have proplem in connetivity to the external world , I make the config as mentioed in the book, and evry service profile created okay.
but there is error in the USCM about IOM and the adapter link down ,m I dot know why , all are okay , I have singel fabric A, and I connect
IOM 1 (left ) to Fabric A by two cables ,for server links , the ulinks are configure same vlan for lan and vsam for MDS , and pin group too.
I see IOM 2 (right) gace inaccibility proplems and I could not connect to same fabric A, \i notice amper lights on both IOM. ??
\i try to reboot the server but the adapte 1/1/1 still said link down. ?? any help
12-14-2010 10:41 AM
Did you try connecting the second IOM to the same FI at any point as you are seeing IOM 2 on chassis connected to only one FI? If so was the conectivity from the balde working before that?
Since I see nothing major running on the chassis, can you remove the chassis and re-add it back to the UCSM. Also make sure before you reconnect that you have cables only from one IOM going to the chassis.
./Abhinav
12-14-2010 11:31 AM
thanks for the reply the system is new installation and nothing online it is a demo.
yes I try to connect the second after intial discovery and before doing any thig on blades , I try to acknoledge but it forbidden me to do so I just return the cable to the original IOM .
I will try your suggestion tomorw , and shall I use the two cables from IOM 1 on the left to the FBI A. shall the GP of FBI A be 2 not one .
the procedure for remove just remove or decomession the recomessioning. ??
thanks so much for the replay
12-15-2010 12:41 AM
Here is how you can Deomm:
1) Make sure you remove thr profiles from the blade.
2) Select ths chassis# in the equipment tab -> Under the genreal tab -> Choose the option for Decommission Chassis
3) Wait for about 10-15 minutes for it to complete
4) To discover it again:
i) First make sure the cables are conencted properly, i.e. only from IOM A to FI-A and the number of cables are same or more then the links specified in the chassis discovery policy,
ii) Select the Chassis OU under the equipment -> Select the "Decommissined" tab from the work pannel. You'll find the chassis which you removed, you can add it back from there.
I am not sure, what you exactly meant by this : "shall the GP of FBI A be 2 not one"??
,/Abhinav
12-15-2010 05:37 AM
thanks to god and abhinav , the UCS now is r
un and functioning LAN and SAN and profile is greate no w I have EXS 4.0 on the Server. My next challange is boot from san and I will do it.
I do the recommession from command line....there is no errors or fualts and even The second IOM disppear I do not want it.
your advice was so helpful
best regards