The setup consists of Chassis Cisco UCS 5108 connected to the 2 Fabric Interconnectors.
The Fabric Interconnecters are connected to the switch 4900M via Fiber connectors.
Created the Service profiles with the vNICs for the Public, Private and Video networks with the specific VLANs created on the switch.
Associated the Service Profiles to the blades.
Issue: The Video ports are having 2 faults 'link-down' and 'vif-down' on all the blades as attached.
Could you please help me? Please let me know if you need any other details.
Thanks,
Arun