baselzind
Level 6
Level 6
Member since ‎10-28-2014
‎03-27-2024

User Statistics

  • 1107 Posts
  • 1 Solutions
  • 3029 Helpful votes Given
  • 204 Helpful votes Received

User Activity

I have got SNTC-8X5XNBD with my new 9XXX switches. I was wondering if this means that i can open tickets with cisco in case i get issues? because when i tried to do so i was able to only open warranty tickets not even Severity 1 tickets? 
We have bought new C9200L-48P-4X which have a 4 10gig uplinks module , which should also be compatible with this 1Gig SFP module GLC-SX-MMD. However when we are trying to connect to our 6500 switch with module WS-X6516A-GBIC it wont come up and there...
Please does XENPAK-10GB-LX4 support OM3 cables? and would it work with SFP-10G-SR-S?
I was facing an issue on my 6500 core switch with one supervisor where it would go directly into rommon and after booting it would lose all config when a power cut happens. after some digging i found out that the "remote command show boot" is differe...
in case of a planned power cut do i need to switch off the 6500 4500 psu manually before the power cut or is it okey to let it shut off anyway when the power cut happens?
Community Statistics
Member Since ‎10-28-2014 03:15 AM
Date Last Visited ‎03-27-2024 12:16 AM
Posts 1,107
Total Helpful Votes Received 204