mearthey
Level 1
Level 1
Member since ‎02-10-2004
‎10-23-2019

User Statistics

  • 1 Posts
  • 0 Solutions
  • 0 Helpful votes Given
  • 0 Helpful votes Received

User Activity

I have 2 x 7009 chassis, each have 2 x SUP1 supervisors (NXOS 6.2(16)), 3 x M108X2-12L, 1 x M148GT-11L line cards and 5 x FAB2 fabric modules. These act as the core switches, with VPCs to downstream Nexus 5500s.I need to replace the modules in each 7...
Community Statistics
Member Since ‎02-10-2004 12:55 AM
Date Last Visited ‎10-23-2019 08:24 AM
Posts 1