03-20-2012 12:43 AM - edited 03-01-2019 10:19 AM
Hi,
we have old Fabric Interconnects and now I want to exchange them with the new 6248 and also I want to exchange the IO-Modules. But all this without downtime of the servers. So what do I have to do that it will work? Is it possible without downtime?
Is it possible to exchange the secondary FI first, then work with diffrent types and firmware until I exchange the primary one?
How can I upgrade the UCS Manager on the new and secondary FI?
Thanks in advance,
Adrian
Solved! Go to Solution.
03-20-2012 12:52 AM
Adrian,
The following document should help you with most of the details:
Thanks!
./Abhinav
03-20-2012 03:36 AM
Adrian, I have done this upgrade twice for customers and both were a success with no downtime. One customer had 10 chassis with around 75 blades and we upgraded them from a pair of 6120s to 6248s. Here are some tips, most of this is in the upgraded guide.
03-20-2012 12:52 AM
Adrian,
The following document should help you with most of the details:
Thanks!
./Abhinav
03-20-2012 01:29 AM
Thanks, but is it necessary to Re-Acknowledge the Chassis?
03-20-2012 01:36 AM
per the document the only need to re-ack the chassis is when you change the port-mapping on the FI, which yes would need the re-ack.
Also if you replacing the 2104 with a 2208 and increase the number of links from 4 to 8 plus need a port-channel betweent the Fi and the IOm it would require you to re-ack the chassis.
Thanks!
./Abhinav
03-20-2012 01:38 AM
Thank you very much for the quick answers!
03-20-2012 03:13 AM
I have one further question.
The build version of the FIs must be the same, so it is not possible to change from 1.4(3l) to 2.0(1w), is it?
Do I have to update the 1.4 Version before?
03-20-2012 03:16 AM
Yes you will have to update to version 2.0 since the 62xx and the 22xx hardware is supported only with the 2.0 version. Asdditionally both the FIs should be on the same firmware version in a clsuter.
./Abhinav
03-20-2012 03:21 AM
But is it possible to run with the 6140 on 1.4 and with the 6248 on 2.0 only for the Exchange.
Now we have two 6240 on 1.4(3l) and the new one are 6248(1w), so is it possible to do the exchange with these two version or is it mandatory to update the old 6240 to 2.0 before?
03-20-2012 03:45 AM
Adrian,
It is mandatory for you to upgrade the previous cluster to 2.0 version.
./Abhinav
03-20-2012 03:36 AM
Adrian, I have done this upgrade twice for customers and both were a success with no downtime. One customer had 10 chassis with around 75 blades and we upgraded them from a pair of 6120s to 6248s. Here are some tips, most of this is in the upgraded guide.
03-20-2012 03:55 AM
Ok, thanks a lot, for your support!
03-24-2012 11:26 PM
The dme running in 2.0 code is different than in 1.4. As abhargava said it is mandatory you upgrade the old cluster to 2.0 first.
What is your FCOE vlan?.
Make sure your production FCOE vlan before you upgrade is other than VLAN 1. Reason being default FCOE vlan in 2.0 is not VLAN 1.
Please read the 2.0 release notes to understand what is new in 2.0
Thanks
Pnarayan
Sent from Cisco Technical Support iPad App
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide