le 24-04-2025 05:22 AM
Hello,
We have 93108TC-FX3P and 93240YC-FX2 switches, each switch is in a stack of 2 with parameterized VPCs.
We would like to know if we can upgrade to ISSU mode like this:
9.3(11) → 10.3(7)M → 10.5(2)F
Is it necessary to start with the primary switch?
If our VPCs are correctly configured, will there be a service interruption?
Thank you very much.
le 24-04-2025 05:41 AM
Hello @Martin Belays
ISSU upgrade, so recommended path:9.3(11) → 10.3(7)M → 10.5(2)F
https://www.cisco.com/c/dam/en/us/td/docs/dcn/tools/nexus-9k3k-issu-matrix/index.html
The upgrade must be triggered on the vPC primary switch, and the process will roll over to the secondary.
No service interruption is expected since vpc is corectly configured ; but I always prefer windows maintenance for that !
Check ISSU requirements for non disruptive upgrade: https://www.cisco.com/c/en/us/td/docs/switches/datacenter/sw/nx-os/tech_note/vpc_upgrade.html
le 24-04-2025 11:52 PM
Noted, thanks for your feedback
le 25-04-2025 12:26 AM
You're welcome.
Découvrez et enregistrez vos notes préférées. Revenez pour trouver les réponses d'experts, des guides étape par étape, des sujets récents et bien plus encore.
Êtes-vous nouveau ici? Commencez par ces conseils. Comment utiliser la communauté Guide pour les nouveaux membres
Parcourez les liens directs de la Communauté et profitez de contenus personnalisés en français