Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
I was thinking if we can automate a vPCs to enable/disable based on a trigger. For Example, I have 4 ports under 2 vPCvPC no.1Leaf_101: Eth1/1Leaf_102: Eth1/1vPC no.2Leaf_101: Eth1/2Leaf_102: Eth1/2 But at one single time one of the vPCs should stay ...
Dear All, Thank you for your input and great discussions. Apparently, I will discuss internally of these points. However, as per my current design, I have to keep both the Leafs connected to the two sites in Europe. Hence, if we can automate the port...
Thank you for the detailed explanation. Please find below a rough sketch of the design. The use case is that the international carrier takes both the links internationally from Asia to Europe passing through land and sea! So the carrier uses a diffe...
There is no Layer 3 involved in my scenario, its only Layer 2 link between ACI Leafs and Catalyst layer switch. The links get impacted due to a fiber cut so that is why i have two vPC links, one of which I will use as a backup. Hence, at a time one ...