Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Last year, at our Corporate Office in Doral, Florida - I was able to redesign the office, and install 2 MS425-16 (Layer 3 Core Switches) and connect (4) Floors of about 35 (MS250 48-port Layer 2 Stacked Switches) using fiber uplinks. It was a crazy o...