The goal is to change Forwarding scale profile to High LPM. According the official guide - Manually reload the switch after the forwarding scale profile policy is applied for the changes to take effect.

I would like to ask, if the switch must be reloaded strictly manually. If I will reload the LEAF switch via GUI or CLI, the effect will not be the same as with manually reload?

Thank you.