cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
818
Views
5
Helpful
1
Replies

CSCvu27464 - Prime Infrastructure Ability to copy and move floors, buildings, and campuses using new maps

jamiehessels
Level 1
Level 1

I have this issue too and overcome it by using the "Export" function in Cisco PI.

Once exported I then renamed the existing Floor Name and Number to something else (the floor you want to duplicate).

Then I ran the "Import" function to import the file saved earlier.

During the Import process the key here is to NOT Overwrite (uncheck) the Message containing "Building 'building_name' exists and will be overwritten"

This will result in an additional floor with the same floor plan and obstacles applied.

I repeated this process for all floors in the building that have the same/similar floor plan and obstacles.

1 Reply 1

Leo Laohoo
Hall of Fame
Hall of Fame

Nice workaround.