Fabric/ Inventory/ your Leaf/ Interfaces/ use the PCInterfaces Tab in the workspace and disable and enable the PCInterfaces on both Switches (in Case of VPC). Disabling and enabling the physical Interfaces does not work!
Hi Thomas,thank you very much for your quick reply. I created the repository allready on the GUI. Validate is success too. I had use the "crypto host-key add" command. I can create Backups via GUI to the sftp Server (Winsolar/ with encryption Key) an...