Hi Expertswe have a customer who has switch stack (member varies fro 3 4 ...8)We have installed APIC EM and going to use PnP to manage those switches. We are not sure how to make a switch as Master in stack using APIC EM. is there a best practice to ...
Hi Experts
Has anyone seen any issues running PIM BiDir over L3 Port-channels ? is it a supported design ?
specifically talking about 68xx catalyst switches.
Thanks
A
Hi AdamI will try that out in LAB. Before that can you verify if below flow is correct :sw-1........................sw-2.......................... PnPsw-3........................sw-4.......................there is a stack of 4 switches and PnP Server...
Hi Luis
how to form a stack with 8 switches in stack .
i do have stack-power diagram for 5 switches but I am not sure how to do the same for 8 switches – can you help please ?
Thanks
Hi All
So far we have N7k--N5k---FEx setup all VLAN were configured on N7K.
but we are changin it to
N7k---->N9504---->N93180EY--->FEX
My Q is :
1.so when we connect FEXex on N93180EY , all port-security configs,dhcp snooping,bpdu guard will be pu...