Hi,We have catalyst 6509 with sup 720 ,3750-12g and 2960 , from 6509 to 3750-12g is connected with 10g and after that 8 nos. 2960 switches are connected with FC port in all 8 departments. Now we have to plan to implement L3 VLAN .We have few points.1...