I need some advice or assistance to get PnP to deploy a complete switch stack configuration at the same times as I do a image upgrade.I'm struggling getting the APIC-EM PnP to work as expected deploying the complete switch (WS-C3650-48PD) configurati...
Now running PnP 1.5.1.35, when I started the troubleshooting I was running 1.4.1.1159. There are two differences in behaviour between those two versions.With 1.4.1.1159 a random number of interfaces on switch one and two were configured but nothing m...
If I compare the configuration in PnP and the running configuration after a successful provisioning it looks like PnP only provided a partial configuration. How do I verify what configuration is really sent to the switch?The switch says so it is sati...
Thanks, will try that out. In my previous tests with stacks I didn't use the provision command as I didn't require it but now it is an other situation.
What will happen with large stacks where the PnP process have already started the deployment of the configuration of the stack before all stack members are up and running? Won't we end up with members of the stack with correct switch numbers but with...
Anyone seen a solution on this issue predefining switch stack order? Booting them in sequence doesnt work reliable from my experiences. If there ain’t an official solution does anyone have a working eem script to resolve this they can share?