Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
We are currently working with an Engineering firm that is designing power distribution in a control room. The specification is to bring 4, No. 6 conductors into a distribution box and which will connect the 6509 using an L6-30, two 220V conductors an...