That is fine for the standard topology.I was asking for a specific one which I ran as per this course https://developer.cisco.com/video/net-prog-basics/05-netdevops.See attached virl file.I did find the workaround though.I have used the command:cml u...
HiI am having the same problem:(venv) [developer@devbox virl_sbx_mgmt]$virl ls --allRunning Simulations╒════════════════╤══════════╤════════════════════════════╤═══════════╕│ Simulation │ Status │ Launched │ Expires │╞════════════════╪══════════╪════...
Here also attached tested configs for 2 leaf switches.My goal was just to do a POC for extending the VLAN across an IP network using EVPN on C9500.The switches are directly connected but you can easily amend the BGP for multihop.I hope that helps.