Good to know. My coworker and I are building a multi pod environment and these switches are across the inter-pod network. I will bring this up to him as an option.
Switch model: N9K-C93180YC-EX
FPGA version mismatch detected. Running version: 0x3 ...
What do you do if the /usr/sbin/chassis-power-cycle.sh command fails on the leaf?
L121# /usr/sbin/chassis-power-cycle.sh*** Running INXOS PE IFC image ***/usr/sbin/chassis-power-cycle.sh: line 9: cctrl2_fpga_test.bin: command not found