Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Hi guys,We have stack of two 3750X switches and we need to install C3KX-NM-10G modules into the switches.Can i power off the member switch first and install the network module and turn it back on( will it join the stack?) and then power off the maste...
Hello,Can any please confirm the C3KX-NM-10G module is hot-swappable.i have checked the cisco's website and it says "Although network modules are hot-swappable, we recommend installing a network module before powering the switch" What steps i need to...
Hi Guys,I have to install a new 3750 switch(switch 5) into the existing stack of four switches with a new 3 meter stackwise cable.My question is if remove the existing cable coming from switch 1 (master) to switch 4 would it affect anything. Please s...
Hi,We are planning to install a new SSM-4GE module on both Active and Standby firewalls.Could anyone tell how can we install an new SSM-4GE with a minimum outage. I was planning to install the module in the following steps.1. Power off the secondary ...
Thanks Hobbe.We have stack power configured.please see belowswitch#show stack-powerPower stack name: Powerstack-2 Stack mode: Power sharing Stack topology: Ring Switch 1: Power budget: 223 Low port priority value: 22 Hig...
Hi,I have got another query regarding the installation of network modulesThese switches have stack power connected as well. i will remove the physical power cables but the switch( on which network module to be installed) willl still be running with...
Thanks Leolaohoo.Sorry for being a pain in the neck. I wanted to get it right as there are critical servers connected to the switches.here are the steps i would take.switch1-masterswitch2-member1 power down the master switch(switch1) at this step swi...