We are in the process of implementing new Cisco Catalyst 9600 switches in a VSS (Virtual Switching System) setup as our new core. We plan to connect these to our existing ACI fabric using an L3 port-channel.
Our plan is to configure a Layer 3 port-channel from the ACI leaf switch and associate it with an existing L3Out.
My question is:
Is it supported to configure the L3 port-channel with one link going to each VSS member switch (i.e., dual-homing to both VSS members), or do both links in the port-channel need to terminate on the same VSS member?

Appreciate any guidance or best practices for this kind of integration.