Hi,
After removing from controller the last spine from Pod 1 in a multi-pod fabric (version 5.2(7g)), what I have is Pod 2 and 3 having leafs and spines, and Pod 1 without any switch.
At that moment I have a lot of interface tunnels on spines and leafs with destination unreachable.
These destination unreachable are the loopback interfaces of old spine and old leafs VPC protection group IP.
Is there any way to delete these tunnels and remove the F0475 faults?
Thank you