cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
1333
Views
0
Helpful
0
Replies

vAPIC deployment

suneq
Level 1
Level 1

Hi,

For our lab, we have 1 ESXi server in which we installed our VMs and 1 vAPIC. The server is connected physically to a Leaf with a single port. The vAPIC is working properly.

When I try to bind EPGs (for my VMs) to the port, I have the fault F0467 : "Configuration failed ... due to Invalid Path Configuration,Port Connected to Controller, debug message: port-configured-for-apic: Port is connected to the APIC"

May I know if it is an expected behavior? Should I have at least 2 ESXi uplinks (1 dedicated to the vAPIC and 1 dedicated to others VMs)? Thanks for your advices.

 

0 Replies 0

Review Cisco Networking for a $25 gift card

Save 25% on Day-2 Operations Add-On License