cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
1038
Views
0
Helpful
2
Replies

setup job with max instances

gurmeetsaran
Level 1
Level 1

Hi,

I wanted to know how to configure a job so that it will have max n instances running all the time. I have tried running my job every 5 mins and job option is set to "run anyway" but that schedules lot of job in parallel.

Regards,

Gurmeet

2 Replies 2

Tracy Donmoyer
Level 1
Level 1

Depending on what you are trying to accomplish you may be able to do it using Resources.

Create a Resource with a limit of n.  Add the resource to the job and specify an amount needed of 1.  This will limit you to a maximum of n occurrences of the job running at any time.

Lumi Mihalcea
Level 1
Level 1

You can set up a job with only the beginning time, let's say midnight - no end time then in Repeats you can select Rerun same occurrence and Repeat every n minutes (do not specify # of times). This will run starting at midnight, every 5 minutes, n times until 11:59 pm. I hope this is what you're looking for.