- ISE is business critical in our environment as it determines network access both for wired and wireless; we are currently running 2.2 - P1. I don't want to upgrade the production environment to P2 or 2.3 even if can be done in seperate steps (per node). We have 2 admin/mon and 2 PSN nodes. Ideally I would like to start from snapshots from the current production nodes and create a new deployment which I could then upgrade, while the production environment isn't disturbed. Is this possible or flexible; did anyone do it that way already and or has guidelines ?