Hey,
I am setting up a bridge-group in a 3640 router for redundancy and I am considering tying all the interfaces in the bridge-group together into a circuit-group to keep the bandwidth.
Questions: If one interface in a circuit-group fails, will the whole group be blocked, or will the load continue to be distributed among the remaining interfaces?
Is there anything on the switch side I need to configure to set up the circuit-group?
Thanks
BT