Guys
Does anyone know a document that can help dual stacking my controller complex (vManage/ vBond/ vSmart)?
1-My environment is fully up and functioning with IPV4
2- I have dual stacked my entire environment, there is IPV6 underlay end to end reachability between cEdges / vmanage/ vbond/ vsmart. But HOW DO I ESTABLISH OVERLAY TUNNELS WITH IPV6. Looks like something is missing. Let recall that in all my cedges/ vsmart/ vmanage, I am still referencing vbond with its IPV4 address. IS THERE A WAY TO SET THIS UP SO THAT WE CAN HAVE BOTH ipv4 AND ipv6 OVERLAY TUNNELS OR IPV6 AS THE PREFERRED OVERLAY TUNNEL?