Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
The project was simple, stack many switches on rack, however, what is the maximum number of racks units with a default stack cable? We have seen 6 rack units are the maximum, but it is too tight, so I think the maximum actually should be only 5 rack ...
I will install new switches 9200 and the vendor design says: 1st switch(1 UR)<-rack cable management(2 UR)-patch pannel(2UR)-rack cable management(2 UR)->2nd switch. I think there are many space, total 6 unit racks and maybe the cable won't reach bot...
Hi Robdowson, I deployed it, I share my knowledge in this link: https://community.cisco.com/t5/project-gallery/stacking-switches/cns-p/4571813 The maximum is 6 but for reasons of tolerance I think it should be 5RUs
It seems that the PE router have configuration nssa, maybe you could solve it with a static ip route 0.0.0.2 255.255.255.255 12.0.0.2, I remember those tansit and point-to-point labels with the areas types (stub, totally stub, nssa, totally nssa)