Hi, I would like to factory default setting for 6 stack 2960X switches.1. By providing "wr erase" on master stack, is it remove on other stack switch also? 2. Is it require to delete vlan.dat and config.text file before "wr erase"?3. Do I need to ren...
Hi, I had created DMZ zone on ASA 5505. and configure dynamic NAT for DMZ subnet.I put one system in DMZ zone and wants to communicate it with outside only. Can you please guide me, If any ACL I have to implement for result? ThanksDD
Hello, Ihave ASA 5505.I would like to use two different subnet (i.e. 192.168.X.X and 10.0.X.X) in DMZ and accessible it to outside network. I have 2 free live IP as well.Can somebody, please guide me for doing same? Regards,DD
Hi,We established IPsec Tunnel. It was active but I found following issue. Please give your suggestion to troubleshoot it.1. 192.168.50.0/24 (Site A) able to reach 192.168.90.0/24. (Site B) and Vice Versa2. 192.168.30.0/24 (Site C) able to reach 192....
Hi,I want to configure multiple DHCP pool on ASA. that I create like int e0/2no shutinterface Ethernet0/2.10vlan 10nameif inside10security-level 100ip address 192.168.10.1 255.255.255.0interface Ethernet0/2.20vlan 20 nameif inside20 security-le...
Hi Leo,Sharing final sequence for verification. Could you pls confirm.1. delete vlan.dat, config.text, config.text.backup from all switch flash.2. change switches priority to 13. Renumber all switches to 14. wr erase5. reload6. Power Off7. Remove sta...
I do in favor of clear everything (delete the VLAN.dat file, delete config.text, delete config.text.backup, renumber and priority) But Can we renumber all switches as 1 and change priority to 1 while all are still in stack ?
Thanks Leo, Just repeat steps for my clarity and share one query to understand.. 1. While all switches are in stack and powered up, issue the command "wr erase".2. While all switches are in stack and powered up, remove all the stacking cable.Here I...
Hi, I have simillar question. I would like to factory default 5 stack 2960X switches.1. By providing "wr erase" on master stack, is it remove on other stack switch also? 2. Do I need to renumber individually by login to them after removing stack cabl...