I am reaching out to inquire about our network upgrade plan for the 4-floor building. The initial phase involves upgrading our core switches from WS-C3560G-48PS to C9500-24X-A (16-port 10G, 8-port 10G) due to budget constraints. Initially, we are foc...
We're planning to upgrade our network, and we'd love to have your input.Management has changed their mind with phases upgrade.Currently, our network includes a Core Switch (Cisco C3560G) and 10 Access Switches (Cisco C2960X), all connected through 1G...
We have this network upgrade plan and would greatly appreciate your valuable input.Our current network setup consists of the following switches, all connected via 1GB Fiber links:- Cisco C3560G as the Core Switch- 10 Cisco C2960X Access SwitchesWe've...
Yes, switch ports are showing drops and overutilization is showing in our prtg monitoring interface of trunks switches to switches.Thank you very much for your great assistance. They are very well appreciated.
Right now, people on the first floor or other floors are often sending or receiving files from our on-premises server simultaneously. Unfortunately, our current 2-gig fiber connection can't always handle this load. When it gets overwhelmed, it causes...
Thanks for the valuable input.Also BTW, is your fiber plant SM? If MM, you might run into fiber length issues with 10g not seen with gig. ----------- We plan to utilize Multi-Mode within the same building using loose cables with 6 cores. Each floor i...
I really appreciate your prompt response to my question regarding the use of 10GB transceivers on all ports of the C9500-24X-A switch. Your insight is invaluable, and I still wanted to seek an opinion on a related matter.A friend of mine shared an al...