Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Hi, We are going to have a network of eight switches in a loop. ie each switch connects to two others. Half the switches are cisco3550, the rest are nortel450. The cisco switches will connect to each other using gbic over fibre, the rest of the loop ...
Hi,I had a similar problem but with 3 sites. I had stp on and could not find fault with the existing config file. I tried altering bridge and switch priorities with no success.I ended up reconfiguring the bridges from scratch. I no longer get the err...
Swack,thanks for your answers. The switches will be connected in a ring. There are no VLANs as there are only about 14 client devices across the network, so we didn't see an advantage in VLANs.When we go to layer3, I thought of breaking the ring in 2...