I like the numbering schema you came up with. At the end of the day, as long as it makes sense in your environment, that's what matters. I use 100-199 for Pod 1 leafs, 10XX for pod 1 spines, 200-299 for pod 2 leafs, 20xx for pod 2 spines, etc. This w...
Hey Ziad,
I would recommend replacing the APICs one at a time instead of increasing the cluster size. Ensure the cluster is fully fit prior to decommission/recommission of each APIC. You can follow the below link for steps on replacing an APIC
AP...
Thanks, Ibrahim. I am still unsure if this should be an L2 or an L3 connection though, the diagram does not provide any of that information. This connection could be either L2 or L3.
Hey Ibrahim,
It can be L2 or L3 depending on how you have it configured. What is the configuration of the interface pointing towards ACI from the 6500's point of view?
If it is an L3 interface, ACI should also be configured as L3 and then yes, an...
Hey Chris, Schedulers are maintained via Admin > Schedulers This could be different on other versions. Let me know if it is not there in your version and i'll take another look. Hope that helps!