Are the ISE patches posted on CCO cumulative or specific. I have a Customer running 2.2 and hit an issue where TAC advised them to deploy Patch 9. IS the Customer meant to load patches 1-8 as well. How are we handling patches?
Can someone please provide confirmation with documentation that ;
We support N:1 MPLS TE Tunnel protection. ie Multiple LSPs can be protected via single Backup Tunnel.
Also we support QoS over Trunk EFP or Interface with multiple EFPs
on the ASR9...