I can't help I'm afraid, but I can add to the problem! I have 3Ks goin to HP procurve 5412. I have VPCs, one to each switch. It all came up fine the first time, but after a reload of 3K-B the 3Ks spanning tree blocked all 4 uplink ports, aka both por...