Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Introduction
There are certain situations in where an On-Demand Techsupport is not able to be performed. In such cases, a local techsupport can be collected instead for either the APIC or an ACI switch. This document outlines this process.
Im...
Introduction:
One of the first steps in building your ACI Fabric is to go through Fabric Discovery. While Fabric Discovery is usually a straightforward process, there are various issues that may prevent you from discovering an ACI switch. This articl...
Hi m1xed0s,
The leaf switch model does not have to be the same model/generation UNLESS the leaf is part of a VPC pair.
Leaf Switches in VPC pair must be the same exact model.
Thank you for the response.
There is one slight error in your procedure. The scp command needs to be run on an APIC CLI. This step is transferring the image from the switch to the APIC. SCP commands needs to be initiated on the APIC CLI when trans...
Thank you for the feedback and very good points.
I have added those pre-requisites onto the article and have also linked very useful matrix that will assist in finding out those information. Thanks!
Hello Shaun,If I understood your question correctly, you would like to know which ports on the leaf has been configured to allow encapsulation vlan 20.
This will actually be a two-step process. First, you will need to convert the encapsulation vla...