Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Hi,I have two Cisco C9500-24Y4C switches in a StackWise Virtual configuration. We are currently using 40-Gig ports for the SVL, and I need to change the SVL link ports to 10-Gig interfaces. How can I make this change with minimal traffic disruption?
Hi Kasun,What is the best way to perform the reconfiguration? For example: should I shut down the standby switch, remove all its cables, then power it on so that it assumes the active role, and without any links I can safely reconfigure the SVL? And ...