cisco C9500-24Y4C stackwise virtual

frank_dux
Frequent Visitor
Frequent Visitor

Hi,

I have two Cisco C9500-24Y4C switches in a StackWise Virtual configuration. We are currently using 40-Gig ports for the SVL, and I need to change the SVL link ports to 10-Gig interfaces. How can I make this change with minimal traffic disruption?

2 Replies 2

hi @frank_dux , SVL configuration need to be do separately and need to restart the switch. so my suggestion is to take a down time and reconfigure the SVL. if you have many stacks, you can plan in different windows to have minimum interruption to the network.

High Availability Configuration Guide, Cisco IOS XE Cupertino 17.9.x (Catalyst 9500 Switches) - Configuring Cisco StackWise Virtual [Cisco Catalyst 9500 Series Switches] - Cisco

Please rate this and mark as solution/answer, if this resolved your issue
Good luck
KB

Hi Kasun,

What is the best way to perform the reconfiguration? For example: should I shut down the standby switch, remove all its cables, then power it on so that it assumes the active role, and without any links I can safely reconfigure the SVL? And how should I approach the reconfiguration of the other switch?