Hi,
I have two Cisco C9500-24Y4C switches in a StackWise Virtual configuration. We are currently using 40-Gig ports for the SVL, and I need to change the SVL link ports to 10-Gig interfaces. How can I make this change with minimal traffic disruption?
12-07-2025 11:55 PM
hi @frank_dux , SVL configuration need to be do separately and need to restart the switch. so my suggestion is to take a down time and reconfigure the SVL. if you have many stacks, you can plan in different windows to have minimum interruption to the network.
12-08-2025 01:14 AM
Hi Kasun,
What is the best way to perform the reconfiguration? For example: should I shut down the standby switch, remove all its cables, then power it on so that it assumes the active role, and without any links I can safely reconfigure the SVL? And how should I approach the reconfiguration of the other switch?
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide