Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Hi guysI'm trying to upgrade the HX cluster but it stuck in post-upgrade tasksI'm trying to upgrade the HX cluster as follows:1- HXDP from 3.5(2d) to 3.5(2i) as a first step and then to 4.5 as a final step2- ESXI 6.0 u3 to 6.5 U3 as a first step and...
Hi guysI'm trying to upgrade the HX cluster but stucking in post-upgrade tasksI'm trying to upgrade the HX cluster as follows:1- HXDP from 3.5(2d) to 3.5(2i) as a first step and then to 4.5 as a final step2- ESXI 6.0 u3 to 6.5 U3 as a first step and...
Hi Guys I have an HX cluster consists of 4 nodes 240c M4SX and 2 FI 6200 series The cluster is fully utilized compute so I need to expand more compute by adding a compute-only node and there are 10 desktops that require GPU but the cluster doesn't h...
Thanks, KirkI appreciate your effortsI have another inquiry I plan to scale up my HX Nodes (HX 240c M4) by adding more RAMs in available empty slots, but I faced a problem with memory speed.The memory which was installed 8 x 32GB DDR4-2400-MHz RDIM...
Thanks all I appreciate your effortsI have another inquiry I plan to scale up my HX Nodes (HX 240c M4) by adding more RAMs in available empty slots, but I faced a problem with memory speed.The memory which was installed 8 x 32GB DDR4-2400-MHz RDIMM...
thanks, Kirk But what about this queryQ- Can I add one compute-only node M5 with different Compute resources (Ram + Processor )of existing nodes in a cluster ? or must be the same compute resources?
you can configure HA and DRS from vcenter no problem, but you must use post install when creating a new vmkernel or new vlan (portgroup) ,because it create the same vlan in service profiles that associated to servers in ucs