09-15-2023 09:05 AM
Good Day,
I need to move my APIC from one Leaf to another leaf, I believe no configuration is required on leaf (fabric Port) except the port should be enabled.
Please advice if anything else is required to do the same.
Many Thanks in Advance.
Regards,
09-15-2023 12:57 PM
Hi @aashfaque ,
You make it sound harder than it is! Assuming that the port you are moving to has never been disabled, you don't need to even enable the port. However, it is probably worth checking that the port has no previous configuration by checking either
09-21-2023 01:00 AM
Hi @aashfaque and @RedNectar ,
I had a similar question - https://community.cisco.com/t5/application-centric-infrastructure/recabling-apic-to-a-different-pair-of-leaf-switches-in-the-same/td-p/4818808
The recommendation that I got was to decommission and recommission the APICs. I did not complete the activity yet. Please post your observations once you complete the activity.
TIA