Dears,
If I have two DCs with two fabrics
in each fabric there is two EPG with VNID 10000 and another one with VNID 20000 (maybe EPG VNID 10000 for VDI users and EPG VNID 20000 for Application) and we create Contract between them.
in DR DC has same with shadow name (10000 and 20000). with contract.
what if EPG VID 20000 in MDC fail and want make EPG VNID 10000 in MDC talk with same contract to EPG in DR with shadow VNID 20000 , how can do this?