Good afternoon,
I am looking for feedback or Ideas to relocate the main site out of two sites on a multisite deployment. I am researching for options that allow to perform migration in phases and avoid a hotcut.
We are stretching without BUM flooding around 5 BDs and each site has around 8-10 local BDs
Mainly NetworkCentry with preferred groups
EPs 90% ESXI, 10% BM
2 spine
4 Leaf
2 ISN
4.2 Train
I am opening to debate options.
Thanks In advance