cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
326
Views
0
Helpful
2
Replies

Catalyst Center Switch Provisioning and Site Assignment

folelbonel
Level 1
Level 1

Hi All,

For those that use Catayst Center automation where you need to assign a switch to a site before you can provison it, do you typically assign the switch to the building or floor level of the network hierarchy?

For access points you have to assign to the floor level of the network hierarchy for placement on maps and granular network profile configuration etc, however you can change the site for an access point once provisioned so you have flexibility if the initial site assignment is incorrect or if things change. You still cannot change the site assignment for switches once provisioned I beleive (you have to remove from Catalyst Center and re-add) so I ideally want to get this right first time. You have the option of assigning switches to the building or floor level of the hierachy but I cant see if there are pros/cons to each option. Assigning to the building level seems easier, however will this come back to bite me in the future?

2 Replies 2

balaji.bandi
Hall of Fame
Hall of Fame

You can not move to different site once the switch provision, you can remove and re-add only option so far as per i know.

may be wish list.

BB

***** Rate All Helpful Responses *****

How to Ask The Cisco Community for Help

Leo Laohoo
Hall of Fame
Hall of Fame

As long as the site is not in Guam (CSCwo44340).