Hi Team,
When migrating from the evaluation VM to a production VM, is it possible to simply increase the necessary resources on those VMs(Distributed) to fit that of the production server or does this migration require a full creation of (in this case) two production VMs with the listed specifications in the installation guide?
Thank you in advance for the help?
Solved! Go to Solution.
08-03-2017 03:29 AM
You can shutdown the VM and increase CPU and memory
Hard disk cannot be changed without special tooling (something I've seen) which is beyond the support of ise team
Sent from my iPhone