cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
660
Views
0
Helpful
3
Replies

Adding new hw to 5510 failover

jmf3186fj
Level 1
Level 1

I have two ASA5510 that are running failover (Active/Stand by). I need to add a 4 port module to each one of the ASA5510. How would I go about doing that? Do i have to shut them down to add the modules? Do I start with the Stanby first? I need your insight, please.

1 Accepted Solution

Accepted Solutions

eddie.mitchell
Level 3
Level 3

I would perform the following:

1-Shutdown the primary (should automatically failover to the backup node)

2-Install the new card on the primary

3-Shutdown backup node and install the card (downtime)

4-Power on both at the same time

I think the key here is to avoid having both nodes up at the same time with the SSM expansion card installed in one and not the other.

Hope this helps.

View solution in original post

3 Replies 3

eddie.mitchell
Level 3
Level 3

I would perform the following:

1-Shutdown the primary (should automatically failover to the backup node)

2-Install the new card on the primary

3-Shutdown backup node and install the card (downtime)

4-Power on both at the same time

I think the key here is to avoid having both nodes up at the same time with the SSM expansion card installed in one and not the other.

Hope this helps.

Youa re Da man!! Thnak you Sir!!! Everything went smooothly successful

Woohoo! ;)

Review Cisco Networking for a $25 gift card