I have two ASA5510 that are running failover (Active/Stand by). I need to add a 4 port module to each one of the ASA5510. How would I go about doing that? Do i have to shut them down to add the modules? Do I start with the Stanby first? I need your insight, please.
Solved! Go to Solution.
02-17-2009 01:23 PM
I would perform the following:
1-Shutdown the primary (should automatically failover to the backup node)
2-Install the new card on the primary
3-Shutdown backup node and install the card (downtime)
4-Power on both at the same time
I think the key here is to avoid having both nodes up at the same time with the SSM expansion card installed in one and not the other.
Hope this helps.
02-17-2009 01:23 PM
I would perform the following:
1-Shutdown the primary (should automatically failover to the backup node)
2-Install the new card on the primary
3-Shutdown backup node and install the card (downtime)
4-Power on both at the same time
I think the key here is to avoid having both nodes up at the same time with the SSM expansion card installed in one and not the other.
Hope this helps.
02-20-2009 10:56 AM
Youa re Da man!! Thnak you Sir!!! Everything went smooothly successful
02-20-2009 11:00 AM
Woohoo! ;)