hi,
we're moving DC location which is just an adjacent building. we got a dual ASA FW setup and was planning to move the secondary ASA to the new DC site, connect the failover cable to a L2 switch VLAN and run the VLAN over an MPLS L2 pseudowire between old and new site so there's still failover/sync between two ASA.
this way, there would be a seamless transition and not incur any downtime. can someone advise if this is doable and made similar activity?